
The construction site project in Riva – Istanbul is a comprehensive study that demonstrates Pramo Prefabrik’s competence in providing modern and functional building solutions. In this project, which was carried out on an area of 4500 m², the working and living spaces of the construction site personnel were optimized and an efficient environment was created. The high-ceilinged dining hall building allows the personnel to eat in a comfortable and spacious atmosphere. The multi-purpose building was designed as an office on the lower floor and a dormitory on the upper floor, meeting both working and accommodation needs.
The management office building solves the food needs of the management and personnel together with the integrated dining hall section. In addition, the 36-person and 3-storey worker dormitory building, which was dismantled from the existing 18 containers and installed with 18 newly produced containers, provides a comfortable living space for the workers. This project has managed to provide high standards of comfort in the construction site with Pramo Prefabrik’s modern and effective solutions.
We are a professional solution partner in prefabricated product alternatives with Prefabricated, Container, Heavy Steel and Light Steel construction systems that we manufacture in our 14.000 m2 production facility.
© Pramo Prefabricated | Container | Steel
We build your dreams, we shape your future with prefabricated solutions!